Print    Close This Window
Brady Renovation Phase II
Brady entrance design drawing 2Brady Middle School renovations will start up again this spring as we begin work on a new entrance, lobby, and reception area along with changes to the original gymnasium space, the clinic and the main offices. The Board of Education will have architectural drawings and various design option samples on display on Feb. 26th at 6 p.m. at the Pepper Pike Learning Center prior to its 6:30 p.m. regular meeting when an overview of the interior design will be presented.